200 Ton Regenerative Heating Furnace ProjectCustomized Purification

Model: JR-200/DR
Type: National Standard Energy-Saving Batch Furnace
Capacity: 200 Tons per Batch
Target Temperature: 1,050 ℃
Lead Time: 50 Days (Design → Manufacturing → Installation → Commissioning)

Get In Touch

Visual Overview of the Dual Regenerative Heating Furnace

Integrated Rail Furnace Structure – Shared frame for both furnace body and car, no foundation required.

Auto-Sealing Door & Car – Airbag seal + four-link mechanism, leakage rate < 2 m³/h.

20° Anti-Sag Brick Structure – Composite fiber + vacuum brick lining, lightweight and durable.

20° Anti-Sag Brick Structure – Composite fiber + vacuum brick lining, lightweight and durable.

Features of the Dual Regenerative Heating Furnace

FeatureCustomer Benefits
Dual Regenerative Combustion System• Saves up to 30% gas compared to cold air burners   • NOx < 80 mg/Nm³, meets National Standard IV
Composite Fiber + Vacuum Brick Lining• 50% lighter walls, 28% less thermal loss   • Shell surface temp ≤ 45 ℃
20° Inclined Support Bricks• Prevents wire sagging, doubles element lifespan
Replaceable Front Impact Bricks• 25 mm ceramic panels, forklift impact repair in 10 min
Foundation-Free Integrated Rail System• Saves 800,000 RMB in civil work   • 1-day full relocation possible
Smart Batch Control• ±3 ℃ uniformity at full 200T load   • Built-in recipes for 50 steel grades

Factory Test Results

Test ItemResult
Empty Chamber Heating (20 ℃ → 1,050 ℃)45 minutes
Heat Surface - Shell Temp Difference38 ℃
Full Load Gas Consumption38 Nm³/ton
Regenerative Switch Heat Loss< 1%
Furnace Door Pressure Drop (500 Pa)26 Pa/min

Realized Customer Value

·Annual Gas Savings: ¥1.4 million (200T × 5 batches/day @ ¥3.5/Nm³)

·No Foundation Required: ¥800,000 saved in civil construction

·40% Reduction in Downtime thanks to modular bricks + drawer-type burner design

·Eco Credit: CO₂ emissions reduced by 3,500 tons/year, eligible for local green subsidies

Final Delivery Checklist

·Furnace and car aligned, laser track calibration < 1 mm

·Regenerative chambers passed 0.6 MPa air-tightness test

·12-point temperature uniformity report included

·On-site training completed (8 hours)

·Spare parts package (burners, bricks, seals) delivered